Rail Car Loading Expansion
CSD Engineers provided construction engineering for a three-bay rail car loading expansion at the site of a major Marcellus-Utica Midstream client. The takeaway from this location includes ethane, propane, butane and other NGLs. This multi-discipline project also included Process Simulation using Aspen HYSYS, Pipe Stress Analysis, as well as automation control system support for the expansion. The project was designed with scalability and constructability to allow for installation with zero disruptions to current operations. The design also allowed for future expansion of the facility.